Newport Facility

 

The facility manufactures various assemblies for many customers, and works closely with SemahTronix main facility in Flippin to manage quality and customer satisfaction. The Newport facility received its ISO Certification in 2007.

Production Equipment (partial list)

  • Megomat ASM 3001
  • 4 AMP Strippers/Crimpers
  • 3 AMP G Presses
  • 6 AMP K Presses
  • AMP Tapetronics
  • Schleuniger Wire Cut/Strip Machine
  • 2 Panduit Tie Lock Installers
  • 9 Schleuniger Wire Strippers
  • Various IDC Crimp Machines: AMP, Molex, etc.
  • Various Crimp Dies: AMP, JST, Hirose, Hollingsworth, Berg, T&B, Molex, Deutsch, Positronics, etc.

Test Equipment

  • 4 Cirris Testers
  • 2 Hipot Testers
  • Cable Scanners
  • Capacitance Tester
  • Digital VOM
  • Digital Crimp Height Micrometer
  • Tensile Strength Tester
  • Numerous specially-designed inspection, measuring, and testing devices

Radio Frequency Equipment

  • 2MP 8015 Strippers
MENU